Project Overview

This project involves the detailed design and construction of two replacement bridges on the A554 Tower Road, Birkenhead. Both the original bridges were constructed around 1931, and form a vital link in the Wirral strategic road network, facilitating access to the Port of Liverpool and major regeneration sites. 

The existing steel truss opening bridge will be replaced with a new semi-through steel box girder single leaf rolling bascule bridge, and the existing fixed truss bridge will be replaced with a new prestressed-reinforced concrete composite flat deck bridge.  Other works include associated improved facilities for pedestrians and cyclists. 

The project will be delivered to a CEEQUAL rating of Very Good and designs will be delivered to BIM Level 2. The design stage is currently underway, with construction programmed to begin in March 2017.

Project Gallery

Client

Wirral Council

Location

The Wirral

Project Value

£7.5m

Contract Period

34 weeks