Project Overview

We are lead Joint Venture partner (with Ferrovial Agroman) on this major scheme in Cardiff. The project involves design and construction of approximately 1km of new dual carriageway and 3.5m wide combined cycle/footway, and improvements to two roundabouts.

The link road connects Queensgate and Ocean Way roundabouts passing through Cardiff Docks; to accommodate this two existing roads, both approximately 750m long, have been diverted and/or reconstructed. Significant utility diversions have been undertaken. 

The conceptual design comprised new embankments either side of a 250m long viaduct passing over two side roads and the Celsa railway, which operates 24/7 and forms an essential link between Celsa’s Castle Works and Rolling Mill. 

The design stage commenced in January 2015. Enabling Works overlapped with the design phase to maintain the overall project programme. During this period we completed all service diversions and constructed the Roath Dock Access and Celsa Roads, thus allowing main construction works to commence in March 2016.

Project Gallery

Client

Welsh Government

Location

Cardiff

Project Value

£36m

Contract Period

92 weeks