Project Overview

Creation of a new split level household waste recycling facility within the existing Penhesgyn site. The facility has been designed and constructed to increase the storage capacity of the facility.

The works comprised the design and construction of a 123m long, 5m high concrete retaining wall and 2400m2 of concrete hard standing area. 

A new drainage system, oil interceptor and duct network were also installed. Other works included the construction of a new access road and improvements to the existing carriageway layout into this new facility.  Further work was carried out in the existing in-vessel composting facility.

Project Gallery

Client

Isle of Anglesey County Council

Location

Anglesey

Project Value

£794k

Contract Period

40 weeks